Sign In | Join Free | My wneducation.com |
|
Brand Name : Tongkai
Model Number : Truss bridge
Certification : ISO,EN1090,SGS ,
Place of Origin : China
MOQ : 1 set
Price : 1500USD ~2000USD/ton
Payment Terms : L/C, T/T, Western Union, MoneyGram
Supply Ability : 3000/month
Delivery Time : 45days
Packaging Details : Nude and Steel case
Material : S460J0,S355JR,S355J0,Gr65,Gr50
Load : HA ,HB,HA+20HB,AASHTO HL-93,HS35-44
Lane : Single lane4.2m,Double Lane 7.35m, Three lane:10.5m
Surface Finish : Painted or Galvanized
Aesthetics : Modern
Tracked Load : 50~80Ts
Load Capacity : High
Application : Steel Structure Bridge
Life : 100 years
Bridge Deck : Steel ,Concrete
Max Span : 90 meters
Loading : HS15,HS20-44,HS25-44, HA,HA+HB ....
Usage : Bridge
Support : Abutment , Piers
Size : Customized Size
Panel Size : 9000mm*11000mm
Surface Protection : hot-dip galvanized
Typical Spans:
● From 30 meters to 110 meters
Typical Characteristics:
● Warren through truss
● 5-meters bays ensure modularity between spans
● Class A width: 1m sidewalk + 7m roadway + 1m sidewalk
● Class B width: 0.5m sidewalk + 6m roadway + 0.5m sidewalk
● Utilizes steel deck as permanent formwork
● Double pipe handrails
● Elastomeric bearings with steel plate reinforcement
● Deck protection angle
● High tension Bolts
● Full hot dip galvanizing to all elements
Standard Supplied Erection Aids:
● Bolts spares
● Drift pins for precise bolt hole alignment
● Temporary Deck Bracing Angles
Typical Supply Time:
● 3 months
Application:
● Long -Span
● Permanent or semi-permanent bridging
● Heavy Load
● Highway bridge
● Rural infrastructure project
● Construction,forestry,oil and mining activities
● Construction site access
● Replacement of damaged bridge
![]() |
Steel Truss Bridge Steel bridge Large span Heavy Load For Construction Site Access And Replacement In High Demand Images |